Capital Equipment Replacements
TCG managed the replacement the entire heating system including but not limited to domestic and heating boilers that were replaced with the highest efficiency condensing boilers, reduction of thermal storage by introduction of smaller tanks to limit hot water idle times in order to increase efficiency as well as the new installation of a building automation system (BAS) to ensure adequate controls.

Aside from our Mechanical department’s assistance with this project, the electrical team ensure adequate drawings and specifications are provided to ensure higher power requirements of the new equipment are adequately designed for.

TCG finalized the project, signed off and ensure applicable incentives were applied for with the assistance of the installing contractor.